Continuous assessment – Tunnel

Continuous assessment of the convergence (radial deformation)
of a tunnel

  1. The Bure site was equipped with a cel
  2. A specific zone was equipped
  3. Results :
  • Radius vs time
  • Convergence followed up over 6 months
  • Accurate comparison with convergence wires or tapes (measurement references)